What is Lean Six Sigma?

Lean Six Sigma is a way to improve a process: deliver what the customer expects, faster, with fewer errors and less wasted effort. It is often presented as a list of tools. First and foremost, it is a way of looking at work.

Lean Six Sigma in one sentence

Lean Six Sigma brings two approaches together. Lean makes a process flow better by removing what adds nothing for the customer: waiting, inventory, movement, rework. Six Sigma makes it more reliable by reducing variation, the differences from one result to the next. In both cases, you measure before you conclude, and you check after you act.

In a company, it takes two forms: small day-to-day improvements made by the teams themselves, and structured projects for tougher problems. The people who do the work are always at the centre, because they are the ones who know where it gets stuck.

A philosophy, not a toolbox

5S, Pareto, control charts, design of experiments: the tools are useful, but a team that applies them without understanding why makes little progress. What makes the difference comes down to six principles.

  1. Start from customer value. An activity creates value if the customer is willing to pay for it. Everything else should be reduced. Inspecting the same part three times is reassuring, but adds nothing for the customer. Better to make the step that creates the defect reliable.
  2. Keep work flowing. Every wait, stock or movement adds lead time without adding anything. A file that waits 9 days for 2 hours of actual work. The problem lies in the queues, not in how fast people work.
  3. Reduce variation. Customers do not feel the average, they feel the spread. A delivery that takes “3 days on average” but varies from 1 to 8 days disappoints more than one that always takes 4 days.
  4. Decide on facts. Measuring before concluding avoids fixing the wrong problem. “Machine B breaks down all the time”; the records show that 70% of stoppages come from a single setting.
  5. Respect and involve people. Those who do the work know where it gets stuck. Improvement happens with them, on the shop floor. Go and see the workstation rather than discussing a dashboard in a meeting.
  6. Improve continuously. Plan, try, check, adjust: small repeated steps beat a big plan that never gets finished. A 1% improvement every week turns a process into something unrecognisable within a year.

This philosophy does not depend on the size of the organisation or its sector. It applies to an individual, a team, a small business, a multinational, a public service or a sports club, with the same questions: what matters to the customer, where is time being lost, and what do the data say?

Where does Lean Six Sigma come from?

It was born from two industrial stories, one Japanese and one American.

  • 1950–1970 At Toyota, Taiichi Ohno and Eiji Toyoda build the Toyota Production System: produce only what is needed, when it is needed, and stop production as soon as a problem appears to solve it at the source.
  • 1980s At Motorola, engineer Bill Smith and his colleagues formalise Six Sigma: reducing variation down to 3.4 defects per million opportunities.
  • 1988–1990 MIT researchers study the global car industry and popularise the term “Lean”, notably in the book The Machine That Changed the World (Womack, Jones and Roos, 1990).
  • 1990s General Electric rolls out Six Sigma on a large scale and structures the Green Belt and Black Belt roles.
  • 2000s The two approaches merge under the name Lean Six Sigma: the speed of Lean and the statistical rigour of Six Sigma.

The two approaches complement each other naturally. Lean without data risks moving problems around; Six Sigma without Lean risks precisely optimising a process full of waste.

The DMAIC method in 5 steps

For problems whose cause is not obvious, Lean Six Sigma follows a five-step approach: DMAIC. Let’s take a running example: a line that fills 500 ml bottles, and overfills them.

D

Define: define the problem

The bottles contain 503 ml on average. Over a year, this overfilling is a significant cost. Goal: centre filling on 501 ml without ever going below 497 ml.

Typical tools: project charter, SIPOC, voice of the customer.
M

Measure: measure the current situation

First, check that the scale is reliable, then measure the volume of several samples to know the real situation.

Tools: measurement system analysis, capability (Cp, Cpk). Play the caliper game · Play the shaft machining game
A

Analyze: find the cause

The data show that most of the gap comes from one of the four nozzles, whose seal wears faster than expected.

Tools: Ishikawa, Pareto, hypothesis tests, correlation.
I

Improve: improve

The team tests several settings and a new seal, then keeps the combination that gives the most stable volume.

Tools: design of experiments, pilot, poka-yoke. Play the catapult game
C

Control: sustain the result

A control chart monitors filling, and a reaction plan says who does what when it signals a drift.

Tools: control charts, standard work, control plan. Play the filling line game

From the shop floor to the boardroom: who does what?

As in martial arts, Lean Six Sigma uses “Belts” to describe each person’s skill level and role. Every level has its place in the organisation: continuous improvement is not the job of a few experts, but of everyone.

LevelRoleFor whomKey topics
White Belt
Understand
Know the principles and recognise waste in your own work.Any employee, student or curious mind.
ValueWasteDMAIC5S
Yellow Belt
Contribute
Take part in projects, collect data, suggest improvements.Operators, technicians, team leaders, support functions.
VSMSIPOCParetoIshikawaBasic statisticsSPC
Green Belt
Lead
Run DMAIC projects within their own scope, alongside their job.Engineers, managers, quality staff, project managers.
MSACapabilityHypothesis testsRegressionControl plan
Black Belt
Transform
Lead complex projects full time and coach Green Belts.Continuous improvement experts, Operational Excellence, consultants.
Design of experimentsANOVAAdvanced statisticsChange management
Master Black Belt
Deploy
Set the strategy, train and mentor Black Belts.Those in charge of deployment across an organisation.
StrategyDeploymentMentoring

Exact roles and requirements vary between companies and certification bodies.

Beyond the Belts: what is a Lean Six Sigma consultant? The 12 hats of the job →

What you need to know, Belt by Belt

There is no single syllabus. We cross-referenced three sources: the exam syllabi of the ASQ (American Society for Quality) and the IASSC (International Association for Six Sigma Certification), and the international standard ISO 18404, which defines the competencies expected of Green and Black Belts. Each level builds on and deepens the previous one.

No label: required by both ASQ and IASSC. ASQ IASSC ISO 18404: specific to one source.

ASQ exam: 80 questions · IASSC exam: 60 questions in 2 hours · ISO 18404 does not define a Yellow Belt.

Fundamentals

Understand the approach

  • Six Sigma principlesreduce variation, Y = f(x)
  • Lean principlesvalue, waste, 5S
  • Roles and responsibilities ASQChampion, Belts, process owner
  • Teamwork ASQteam types, stages of development, communication
  • Six Sigma metrics ASQDPU, DPMO, yield, sigma level

Define

Frame the problem

  • Voice of the customer (VOC)
  • Critical to quality characteristics (CTQ) IASSC
  • Project selection ASQ
  • Stakeholders and their expectations
  • Process inputs and outputsSIPOC
  • Project charter and business case
  • Pareto
  • Supply chain ASQ
  • Project management ASQcommunication plan, planning, phase reviews

Measure

Measure the current situation

  • Process mapping IASSC
  • Descriptive statistics and chartsmean, standard deviation, histogram
  • Normal distribution
  • Data collection plans and techniques ASQ
  • Qualitative and quantitative data ASQ
  • Measurement system analysisaccuracy, precision, Gage R&R

Analyze

Find the causes

  • Ishikawa and root cause analysis5 Whys
  • FMEA
  • Lean analysis tools ASQVSM, waste
  • Corrective and preventive action ASQ8D
  • Common and special causes ASQ
  • Correlation and regression ASQbasics
  • Hypothesis testing ASQbasics

Improve

Improve

  • Kaizen and kaizen blitz ASQ
  • PDCA ASQ
  • Cost-benefit analysis ASQ

Control

Sustain the result

  • Control planinstructions, monitoring metrics, escalation
  • Work instructions and procedures (SOP)
  • Control charts ASQreading
  • Document control ASQ
  • Visual management IASSC
  • Kanban and poka-yoke IASSC
  • Sustaining 5S IASSC

ASQ exam: 100 questions · IASSC exam: 100 questions in 3 hours · ISO 18404: competencies expected of a Green Belt.

Six Sigma and the organisation

The link with strategy

  • Six Sigma basicshistory, Y = f(x), organisational goals
  • Lean concepts7 wastes, 5S, flow
  • Value Stream Mapping (VSM)
  • DFSS road maps ASQ

Define

Frame the project

  • Voice of the customer, business and employeetranslated into CTQs
  • Project selection, business case and charter
  • Financial evaluation and cost of poor quality
  • SIPOC, owners and stakeholders
  • MetricsDPU, DPMO, FTY, RTY, cycle time
  • Pareto
  • Benchmarking ASQ
  • Project management ASQplanning, risks, documentation, closure
  • Management tools ASQaffinity, tree, matrices, PDPC
  • Team dynamics ASQstages, roles, decision tools

Measure

Measure and qualify the data

  • Process mapping and X-Y matrix
  • Probability and the central limit theorem
  • Distributionsnormal, binomial, Poisson, t, F, chi-square
  • Data types, sampling and collection plan
  • Descriptive statistics, normality and charts
  • MSA for variable and attribute data
  • CapabilityCp, Cpk, Pp, Ppk, stability
  • Short term, long term and the 1.5 sigma shift ASQ

Analyze

Prove the causes

  • Multi-vari studies
  • Ishikawa, FMEA and root causes
  • Hypothesis testingα and β risks, power, practical significance
  • Tests for normal datat, F, ANOVA, proportions, chi-square
  • Tests for non-normal data IASSC
  • Sample size IASSC
  • Correlation and simple linear regression
  • Gap analysis ASQ

Improve

Test and implement

  • Multiple regression IASSCresiduals, intervals, Box-Cox transformation
  • Design of experiments: terms and charts ASQfactors, levels, interactions
  • Waste eliminationpoka-yoke, kanban, pull
  • Cycle time reduction ASQcontinuous flow, SMED
  • Kaizen and implementation plan ASQpilot, roll-out

Control

Sustain the result

  • SPC and rational subgrouping
  • Control chartsI-MR, X̄-R, X̄-S, p, np, c, u
  • CUSUM and EWMA charts IASSC
  • Control plancost-benefit, monitoring, reaction plan
  • Visual management and 5S
  • Document control, training and audits ASQ
  • TPM and PDCA ASQ

Competencies

What ISO 18404 expects of a Green Belt

ISO 18404
  • Change management
  • Stakeholder management
  • Team leadership and motivation
  • Creativity and problem solving
  • Decision making
  • Presentation and reporting
  • Using statistical softwareMinitab, JASP

ASQ exam: 150 questions · IASSC exam: 150 questions in 4 hours · ISO 18404: competencies expected of a Black Belt.

Planning and deployment

Drive improvement across the organisation

ASQ
  • Lean, Six Sigma and organisational maturity
  • Project selection and prioritisation
  • Strategic planningSWOT, ROI, continuity
  • Rolesexecutives, champions, sponsors, Belts
  • Barriers and causes of failure

Processes and metrics

Measure organisational performance

ASQ
  • Impact on customers, suppliers and stakeholders
  • Benchmarking
  • Balanced Scorecard, KPIs, OKRs
  • Leading and lagging indicators
  • Financial measuresNPV, ROI, hard and soft savings

Team management

Lead and develop teams

ASQ
  • Team types and success factors
  • Leadership styles and motivation
  • Group behaviour and conflict
  • Decision toolsconsensus, nominal group, multivoting
  • Team training

Define

Frame the project

  • Voice of the customer and segmentation
  • Customer requirementsCTQ tree, SIPOC, QFD, Kano
  • Business case, problem statement, SMART goals
  • Cost of poor quality and project metrics
  • Project management ASQGantt, WBS, RACI, tollgates
  • Management tools ASQaffinity, tree, matrices, PDPC

Measure

Measure and qualify the data

  • Flow metricsWIP, takt time, cycle time, throughput
  • MappingVSM, spaghetti, gemba, X-Y matrix
  • Data, sampling and collection plan
  • Advanced MSAGage R&R, bias, linearity, attributes
  • Distributions and the central limit theorem
  • CapabilityCp, Cpk, Pp, Ppk, Cpm, non-normal data
  • MetricsPPM, DPMO, DPU, FPY, RTY

Analyze

Prove the causes

  • Correlation, regression and residual analysis
  • Hypothesis testingpower, type I and II errors
  • Sample size and intervalsconfidence, prediction, tolerance
  • Tests for means, variances and proportionsANOVA, chi-square
  • Non-parametric tests IASSCMann-Whitney, Kruskal-Wallis, Mood
  • Multivariate analysis ASQfactor, discriminant, MANOVA
  • FMEA and root causesRPN, fault tree, A3

Improve

Optimise and implement

  • Multiple and non-linear regression IASSC
  • Design of experiments principlesrandomisation, blocking, confounding, resolution
  • Full and fractional factorial designs
  • Pull, kanban, 5S, poka-yoke
  • Continuous flow, SMED, heijunka ASQ
  • Theory of constraints and OEE ASQ
  • Pilot, simulation and solution selection

Control

Sustain the result

  • SPC and rational subgrouping
  • Choosing control chartsX̄-R, X̄-S, I-MR, p, np, c, u
  • CUSUM and EWMA charts IASSC
  • Control plan and measurement system re-analysis
  • TPM and visual management
  • Sustaining gainslessons learned, SOPs, training, hand-over

Design for Six Sigma

Get the design right first time

ASQ
  • DMADV and DMADOV
  • Design for Xcost, manufacturing, maintenance
  • Robust design and statistical tolerancing

Competencies

What ISO 18404 expects of a Black Belt

ISO 18404
  • Leading cross-functional projects
  • Training and coaching Green Belts
  • Presenting at phase reviews
  • Critical analysis of data
  • Change and stakeholder management
  • Assessing team effectiveness

Summary based on the ASQ (2022) and IASSC Bodies of Knowledge and the ISO 18404:2015 standard. FLOW Engineering is independent and not affiliated with any of these organisations.

In everyday life

The same habits work outside the factory:

  • In the morning, keys, badge and charger each have their place by the door. No more searching, no more stress when leaving. (5S)
  • A shopping list on the fridge, updated as soon as a product is opened: you buy what is missing, at the right time. (Pull · Kanban)
  • In a workshop, every tool outlined on a shadow board: one glance is enough to see what is missing. (Visual management)
  • In sport, filming your manoeuvres, noting mistakes and standardising what works: performance improves race after race. (PDCA · Standardisation)

Nothing spectacular: small, repeated improvements that end up changing everyday life.

Training and certification

There is no single governing body: several organisations issue Lean Six Sigma certifications, each with its own syllabus, exam format and requirements. The best-known international bodies publish the list of competencies assessed at each level.

FLOW Engineering is an independent practice and exam preparation platform: it does not issue official certifications and is not affiliated with any certification body. Its role is to help you understand, practise and sit the exam of your choice with confidence.

Where do you stand?

Test your basics with the free White Belt, then practise with explanations after every answer.

Frequently asked questions

What is the difference between Lean and Six Sigma?

Lean focuses on flow and removing waste (waiting, inventory, movement, rework). Six Sigma focuses on reliability by reducing variation with data and statistics. Lean Six Sigma combines the two.

Do I need to be good at statistics?

Not to get started: the White Belt and Yellow Belt mostly require common sense and a few basics. Statistics become more important at Green Belt, and even more at Black Belt.

Is Lean Six Sigma only for manufacturing?

No. It is used in services, healthcare, logistics, banking, public administration… and its principles also apply in everyday life.

Which level should I start with?

The White Belt to discover the principles, then the Yellow Belt to take part in projects. The Green Belt suits those who want to lead improvement projects themselves.